Reduction of Lean Wastes by Using Value Stream Mapping: A Case Study of Textile Company in Pakistan

Authors

  • Atam Kumar Università Della Calabria
  • Ramesh Kumar Università degli Studi di Genova
  • Ali Gul Mehran University of Engineering and Technology

DOI:

https://doi.org/10.47604/ijscm.2399
Abstract views: 249
PDF downloads: 73

Keywords:

Lean Manufacturing, Lean Wastes, Value Stream Mapping, Textile Industry, Stitching Department, Time Study

Abstract

Purpose: Lean manufacturing, originating from the Toyota Production System (TPS), aims to reduce waste and optimize resources. Developed countries must adopt Lean practices for performance improvements while developing countries often use just-in-case approaches. Value Stream Mapping (VSM) is a crucial tool for diagnosing, implementing, and maintaining Lean Manufacturing, helping identify improvement opportunities and eliminating waste. The research at the company aims to eliminate Lean wastes and line unbalancing issues to improve lead time and the value-added ratio (VAR), enhancing production efficiency. The research aligns with Sustainable Development Goal 12 (Responsible Production & Consumption) by focusing on waste reduction.

Methodology: The research uses time study, Edaw max, and Visio software to analyze tasks, create VSMs of current and future states, and control charts to examine data variations over time. Data collection involves cycle time, batch size, packet size, and the number of workers required for each activity.

Findings: The research objectives include studying the existing scenario of production units via VSM, identifying, and eliminating Lean wastes, and comparing proposed and existing scenarios for improvement opportunities. The literature review highlights the importance of Lean manufacturing in eliminating unnecessary processes, reducing lead time, and fostering positive stakeholder relationships.

Unique Contribution to Theory, Practice and Policy: This study suggests the better way to reduce the lean wastages and balance the line by using VSM technique. The future state VSM is created to conceptualize potential improvements and gather feedback, focusing on reducing non-value-adding tasks, work-in-process inventory, workforce, and overall process time.

Downloads

Download data is not yet available.

References

M. A. Habib, R. Rizvan, and S. Ahmed, “Implementing lean manufacturing for improvement of operational performance in a labeling and packaging plant: A case study in Bangladesh,” Results in Engineering, vol. 17, Mar. 2023, doi: 10.1016/j.rineng.2022.100818.

A. Sabah, L. Al-Kindi, and Z. Al-Baldawi, “Adopting Value Stream Mapping as a Lean Tool to Improve Production Performance,” Engineering and Technology Journal, vol. 41, no. 6, pp. 1–14, Feb. 2023, doi: 10.30684/etj.2023.136269.1307.

A. J. D. Forno, F. A. Pereira, F. A. Forcellini, and L. M. Kipper, “Value stream mapping: A study about the problems and challenges found in the literature from the past 15 years about application of Lean tools,” International Journal of Advanced Manufacturing Technology, vol. 72, no. 5–8, pp. 779–790, 2014, doi: 10.1007/s00170-014-5712-z.

A. Deshkar, S. Kamle, J. Giri, and V. Korde, “Design and evaluation of a Lean Manufacturing framework using Value Stream Mapping (VSM) for a plastic bag manufacturing unit,” 2018. [Online]. Available: www.sciencedirect.comwww.materialstoday.com/proceedings2214-7853

K. Venkataraman, B. V. Ramnath, V. M. Kumar, and C. Elanchezhian, “Application of Value Stream Mapping for Reduction of Cycle Time in a Machining Process,” Procedia Materials Science, vol. 6, pp. 1187–1196, 2014, doi: 10.1016/j.mspro.2014.07.192.

P. M. Masuti and U. A. Dabade, “Lean manufacturing implementation using value stream mapping at excavator manufacturing company,” in Materials Today: Proceedings, Elsevier Ltd, 2019, pp. 606–610. doi: 10.1016/j.matpr.2019.07.740.

B. Singh, S. K. Garg, and S. K. Sharma, “Value stream mapping: Literature review and implications for Indian industry,” International Journal of Advanced Manufacturing Technology, vol. 53, no. 5–8. pp. 799–809, Mar. 2011. doi: 10.1007/s00170-010-2860-7.

M. A. Samad, J. Abdullah, and Md. A. H. Rifat, “Reduction of Manufacturing Lead Time by Value Stream Mapping of a Selected RMG Factory in Bangladesh,” Asian Journal of Engineering and Applied Technology, vol. 12, no. 1, pp. 10–17, May 2023, doi: 10.51983/ajeat-2023.12.1.3578.

“httpswww.purdue.eduleansixsigmaonlineblogvalue-stream-mapping.”

P. F. Andrade, V. G. Pereira, and E. G. Del Conte, “Value stream mapping and lean simulation: a case study in automotive company,” International Journal of Advanced Manufacturing Technology, vol. 85, no. 1–4, pp. 547–555, Jul. 2016, doi: 10.1007/s00170-015-7972-7.

A. Azizi and T. a/p Manoharan, “Designing a Future Value Stream Mapping to Reduce Lead Time Using SMED-A Case Study,” Procedia Manuf, vol. 2, pp. 153–158, 2015, doi: 10.1016/j.promfg.2015.07.027.

U. K. Teichgräber and M. De Bucourt, “Applying value stream mapping techniques to eliminate non-value-added waste for the procurement of endovascular stents,” Eur J Radiol, vol. 81, no. 1, Jan. 2012, doi: 10.1016/j.ejrad.2010.12.045.

J. M. Rohani and S. M. Zahraee, “Production Line Analysis via Value Stream Mapping: A Lean Manufacturing Process of Color Industry,” Procedia Manuf, vol. 2, pp. 6–10, 2015, doi: 10.1016/j.promfg.2015.07.002.

S. Tyagi, A. Choudhary, X. Cai, and K. Yang, “Value stream mapping to reduce the lead-time of a product development process,” Int J Prod Econ, vol. 160, pp. 202–212, Feb. 2015, doi: 10.1016/j.ijpe.2014.11.002.

A. R. Rahani and M. Al-Ashraf, “Production flow analysis through Value Stream Mapping: A lean manufacturing process case study,” in Procedia Engineering, Elsevier Ltd, 2012, pp. 1727–1734. doi: 10.1016/j.proeng.2012.07.375.

J. A. Garza-Reyes, J. Torres Romero, K. Govindan, A. Cherrafi, and U. Ramanathan, “A PDCA-based approach to Environmental Value Stream Mapping (E-VSM),” J Clean Prod, vol. 180, pp. 335–348, Apr. 2018, doi: 10.1016/j.jclepro.2018.01.121.

A. P. Lacerda, A. R. Xambre, and H. M. Alvelos, “Applying Value Stream Mapping to eliminate waste: A case study of an original equipment manufacturer for the automotive industry,” Int J Prod Res, vol. 54, no. 6, pp. 1708–1720, Mar. 2016, doi: 10.1080/00207543.2015.1055349.

A. Batwara, V. Sharma, M. Makkar, and A. Giallanza, “Towards smart sustainable development through value stream mapping – a systematic literature review,” Heliyon, vol. 9, no. 5. Elsevier Ltd, May 01, 2023. doi: 10.1016/j.heliyon.2023.e15852.

W. M. Goriwondo, S. Mhlanga, and A. Marecha, “USE OF THE VALUE STREAM MAPPING TOOL FOR WASTE REDUCTION IN MANUFACTURING. CASE STUDY FOR BREAD MANUFACTURING IN ZIMBABWE.”

S. Ghaziani, G. Dehbozorgi, M. Bakhshoodeh, and R. Doluschitz, “Identifying Loss and Waste Hotspots and Data Gaps throughout the Wheat and Bread Lifecycle in the Fars Province of Iran through Value Stream Mapping,” Sustainability (Switzerland), vol. 15, no. 10, May 2023, doi: 10.3390/su15108404.

Y. Schoeman, P. Oberholster, and V. Somerset, “Value Stream Mapping as a Supporting Management Tool to Identify the Flow of Industrial Waste: A Case Study,” 2020, doi: 10.3390/su130.

S. Ramakrishnan, V. Ramaswamy, M. M. Bishnoi, and S. S. Babu, “Sustainability via value stream mapping-A Lean study in Genset industry,” in Proceedings of 3rd IEEE International Conference on Computational Intelligence and Knowledge Economy, ICCIKE 2023, Institute of Electrical and Electronics Engineers Inc., 2023, pp. 293–298. doi: 10.1109/ICCIKE58312.2023.10131781.

S. Kumar, A. K. Dhingra, and B. Singh, “Process improvement through Lean-Kaizen using value stream map: a case study in India,” International Journal of Advanced Manufacturing Technology, vol. 96, no. 5–8, pp. 2687–2698, May 2018, doi: 10.1007/s00170-018-1684-8.

“Https://www.slideshare.net/jmachado33/value-stream-mapping-1.”

https://books.google.it/books?hl=en&lr=&id=kqXeEAAAQBAJ&oi=fnd&pg=PA1&dq=time+and+motion+study+by+FW+taylor&ots=ciHnLP2ZIz&sig=tVnWgeGE2yJZ4YUHrq6GTvJLurs&redir_esc=y#v=onepage&q&f=true.”

https://books.google.it/books?hl=en&lr=&id=WcLkBwAAQBAJ&oi=fnd&pg=PA63&dq=time+and+motion+study+by+FW+taylor&ots=_G8wIYBPbc&sig=ThXFiex8EEzL3AahKJT-Crq9iKw&redir_esc=y#v=onepage&q=time%20and%20motion%20study%20by%20FW%20taylor&f=false.”

A. A. Tikhomirov, “‘The first case of scientific time-study that I ever saw…’: G.A. Wentworth’s impact on F.W. Taylor,” Journal of Management History, vol. 17, no. 4, pp. 356–378, Sep. 2011, doi: 10.1108/17511341111164391.

Downloads

Published

2024-03-09

How to Cite

Kumar, A., Kumar, R., & Gul, A. (2024). Reduction of Lean Wastes by Using Value Stream Mapping: A Case Study of Textile Company in Pakistan. International Journal of Supply Chain Management, 9(2), 37–61. https://doi.org/10.47604/ijscm.2399

Issue

Section

Articles