Factors Influencing Implementation of Agricultural Projects in Rural Areas of Rwanda: A Case of Bugesera District

Authors

  • Mr. Nkusi Ronald Mount Kenya University
  • Dr. Eugenia Nkechi Irechukwu (PhD) Mount Kenya University

DOI:

https://doi.org/10.47604/ijepm.3053

Keywords:

Project Implementation, Agriculture Project Performance

Abstract

Purpose: The aim of the study is to assess the factors influencing Implementation of Agricultural projects in Bugesera District Eastern Province of Rwanda from 2022-2024.

Methodology: The study selected Bugesera District as a study population with 80 target population. The study adopted descriptive survey that involves quantitative approaches. Qualitative analysis was to review the existing Literature, and quantitative involved collecting of data from the field. In this research Bugesera District was study population with 80 target population and sample size of 67%. Yaman formula and then purposive sampling technique was adopted. Both secondary and primary data used. Therefore primary data collected through questionnaires where formulated and forwarded to respondents to gather primary data, SPSS version 25 used in analysis and presentation of data it table, descriptive statistical analysis, was comprised of mean and standard deviation as well as inferential statistics such as Pearson correlation (r) and multiple linear regression analysis.

Findings: The study highlighted their opinions with the rate of 58.6% strongly agreed, 26.2 agreed 13.7% indicated neutral, and 2.3% disagreed with mean of 6.5 and standard deviation of 1.76, respondents highlighted their about the statement of stakeholder engagement with high rate of 52.1%, strongly agreed, and 28.9% agreed, 12.7% stated neutral, 3.9% disagreed, 2%strongly disagreed, with mean of 6.3 and standard deviation of 1.78. and lastly 56.5% strongly agreed, 25.5% agreed, 11.9% stated that neutral, 3.9% disagreed, 1.9% strongly disagreed, the statement of training provide knowledge and skill with mean of 6.333 and standard deviation of 1.7. Researcher revealed that training of stakeholders and farmers has positive effects on agricultural project implementation in Bugesera District.

Unique Contribution to Theory, Practice and Policy: The researcher recommended to Bugesera District in department of agricultural projects to continue humanize project planning, allow stakeholder involvement and season training of farmers, such that planned project of agriculture implemented at upper level.

Downloads

Download data is not yet available.

References

Ahen, F. (2017). Responsibilization and MNC–stakeholder engagement: Who engages whom in the pharmaceutical industry? In R. E. Freeman, J. Kujala, & S. Sachs (Eds.), Stakeholder engagement: . Clinical research cases (pp. 87–112). Springer.

Ahmed, F. (2019). The importance of adequate scheduling. Association of Project Management.

Al-Agele, D. H. K., & Ali, A. J. (2017). Mismanagement Reasons of the Projects Execution Phase (Vol. 23). Journal of Engineering.

Al-hajj, A., & Zraunig, M. M. (2018). The Impact of Project Management Implementation on the Successful Completion of Projects in Construction. International Journal of Innovation, Management and Technology,9(1), 45–55. https://doi.org/10.18178/ijimt.2018.9.1.781

Benedict, A. &. (2020). Performance improvement of non-governmental organisations through financial management: a case study of young men’s Christian association of Ghana ((2), ed., Vol. 8). Journal of Accounting, Business and Finance Research.

Campos, C.M.C., da Silva Oliveira, D., Feitoza, A. H. P., & Cattuzzo, M. T. (2017). Reliability and Content Validity of the Organized Physical Activity Questionnaire for Adolescents. Educational Research.

Edward Elgar Njeri, D. N., & Were, S. (2019). Determinants of project performance in non-govermental organizations in kenya, a case study of hand in hand EASTERN AFRICA. International Journal of Business Management and Finance, 1(1), 3-12.

Hackett. (2018). In Predictive ability of the medicine ball chest throw and vertical jump tests for determining muscular strength and power in adolescents. Measurement in Physical Education and Exerc.

Heikkinen, A., Kujala, J., & Inha, M. (2019). Stakeholder engagement in a non-profit organisation: An issue-based perspective. International Journal of Human Resources Development and Management,.

Heravi, A. C. V. a. T. B. (2015). Evaluating the level of stakeholder involvement during the project planning processes of building projects. International Journal of Project Management.

Jason, E. (2016). Senior Management Support and Project Implementation. Project Management Review.

Liu, H, Jazayeri, E. & Dadi, G. B. (2017). Establishing the influence owner practices on construction safety in an operational excellent model. Journal of construction engineering and management 161(ASCE) CO.

Magassouba, S. M., Malek, A., Tambi, B. A., Alkhlaifat, B. I., Aziz, A., & Abdullah, B. (2019). Influence of Stakeholders Involvement on Development Project Performance in Guinea. International . Journal of Academic Research in Business and Social Sciences,.

Markiz, Y., Margono, S., Wirawan, I. D., & Ainur, R. (2017). . The influences of leadership styles, organizational communication, and job satisfaction toward employees’ job performance in doing construction jobs: a study on three construction companies in j.

Meier D, Collet TH, Locatelli I, Cornuz J, Kayser B, Simel DL, and Sartori C. (2017). Does this patient have acute mountain sickness. The rational clinical examination systematic review. JAMA 318:1810–1819 .

Merriam-Webster. (2017). Online dictionary”, available at: . www.merriam-webster.com (accessed 28 May 2017.

MINEDUC. (May 2019 ). Stakeholder Engagement Plan Quality Basic Education for Human Capital Development in Rwanda. . Kigali: MINEDUC.

Mirawati, N. O. S. N. &. M. I. R. (2015). Supplier-contractor partnering impact on construction performance: A study on Malaysian construction industry.. . Journal of Economics, Business and Management.

Mitchell, J. R., Mitchell, R. K., Hunt, R. A., Townsend, D. M., & Lee, J. H. (2020 ). Stakeholder engagement, knowledge problems and ethical challenges. Journal of Business Ethics. Online first.

Nyandika, F. O., & Karanja, N. (2014). Influence of Stakeholders' Participation on Perormance of Road Projects at Kenya National Highways Authority (Doctoral dissertation, IISTE). .

O’Halloran, M. (2014). The awareness of stakeholder management amongst project managers in the construction industry in Ireland, (Vols. 3, (4) ). Journal of Business Management.

Ouma, O. A., & Kamaara, M. (2018). Determinants of Successful Implementation of Donor Funded Projects in Kenya: A Case of Pathfinder International. (Vols. 2(1), 70-87). Journal of Entrepreneurship & Project Management,.

Phillips, R. A., Barney, J. B., Freeman, R. E., & Harrison, J. S. (2019). Stakeholder theory. In J. S. Harrison, J. B. Barney, R. E. Freeman, & R. A. Phillips (Eds.), The Cambridge handbook of stakeholder theory. Cambridge University Press.

Downloads

Published

2024-11-04

How to Cite

Nkusi, R., & Irechukwu, E. (2024). Factors Influencing Implementation of Agricultural Projects in Rural Areas of Rwanda: A Case of Bugesera District . International Journal of Entrepreneurship and Project Management, 9(4), 1–21. https://doi.org/10.47604/ijepm.3053

Issue

Section

Articles